Havnen i Kristiansand har denne uken fått sin andre landstrømscontainer, resultatet av Enovas første utdelingsrunde til landstrømprosjekter tidligere i år.

PowerCon Triple Pulse Tester – the system for automated test and characterization of power modules.

Link: PowerCon Triple Pulse Tester

Banebrydende opfindelser og teknologier fra Aalborg universitet skaber grundlag for udvikling og vækst i samfundet gennem aftaler om teknologioverførsel med virksomheder fra hele verden.

Link: PowerCon Triple Pulse Tester

PRESSEMEDDELELSE 22.09.16

PowerCon A/S leverer første landstrømsanlæg til Kristiansand Havn

Landstrømsanlæg til Kristiansand Havn.

Nordjysk ingeniørvirksomhed vil videreudvikle prototype fra Aalborg Universitet til et smart nyt 3-i-1 instrument, som gør det lettere at teste effektelektroniske komponenter til brug i energibranchen.

Hadsund-virksomheden Powercon er både med, når der skal testes nye idéer for Innovationsfonden, og når lokale firmaers innovation skal vurderes.

PowerCon A/S

PCIM 2015 Stand No. 7-538 PowerCon and the department of Energy Technology at Aalborg University is attending PCIM, Nürnberg 19.-21.05.2015 at stand No 7-538. Hope to see you next week.

PowerCon Onshore Power

PowerCon´s low cost Onshore Power Systems are very competitive turnkey electrical solutions for the benefit of the environment.

KK Wind Solutions lukker sin afdeling i Aalborg og sender ansatte fra afdelingen til PowerCon i Hadsund.

In connection with credit rating by Bisnode Credits of PowerCon A/S, we have been given the highest rating. AAA rating is given to companies with a very strong economy and very good ability to meet payment obligations.

Energiteknologiske forskningsprojekter

Projektet " Multi-level mellemspændingskonverter" er et udviklings-og demonstrationsprojekt, som ved at forslå et nyt konverter-design har til formål at optimere en af de vigtigste delsystemer i en vindmølle. Projektet er et samarbejde mellem forskning og industri og vil øge skabelsen af både udviklings- og produktionsjob i sektoren.

The project " Multi-level medium voltage" converter is a development and demonstration project, which by proposing at new design aims at optimizing one of the most important subsystems in a wind turbine. It is an collaboration between research and industry companies and will boost creation of both engineering and production jobs in the sector.

Sustainability. Mariagerfjord Municipality has high ambitions in the energy sector. These raise the business council now another notch.

Article from Randers Amtsavis, referring to an energy conference, which focuses on how far local is currently with green energy and hydrogen society. How to get the cars to run on wind power, what a disused salt drilling has to do whit energy. What the largest hydrogen consumer does to hydrogen, and how to make hydrogen.

Article from Randers Amtsavis, referring to a company portrait following Mariager Fjord Business Council was meeting earlier this spring, and elected the engineering company Powercon in Hadsund as the most innovative company.

One of PowerCon employees, Engineering Torben N. Matzen, was of Mariagerfjord Business Council invites to hold a posts at their Energy Conference May 23 in Hobro.

Describing Power Electronics and sustainable sources of energy - energy from source to consumer. Status, Prospects and Challenges Seen from a local business.

Mariagerfjord Business Council wishes Congratulations.

Mariagerfjord Kommune

PowerCon A/S has been qualified in Mariagerfjord municipality Innovation competition along whit two other companies, also from Mariagerfjord Municipality and is now in the final for Nordjydsk inovations Price 2014.

Company of the Week, PowerCon A/S

BrancheNews has chosen PowerCon A / S for the companyof the week in connection with PowerCon A / S has become a new member of the Metal and Engineering Industry.

EL, ENERGI, TEKNIK OG AUTOMATION

When you as Powercon manufactures test equipment for back-to-back generator test bench up to 8MW, then it's challenging the components - Especially when the test equipment must be Connected to the items to be measured on.

The heavy boys test equipment must also be connected.

When you as Powercon manufactures test equipment for back-to-back generator test bench up to 8MW, then it's challenging the components - Especially when the test equipment must be Connected to the items to be measured on.