ALT OM TEKNIK

The heavy boys test equipment must also be connected.

When you as Powercon manufactures test equipment for back-to-back generator test bench up to 8MW, then it's challenging the components - Especially when the test equipment must be Connected to the items to be measured on.

Peter C Knudsen - ALT OM TEKNIK

De tunge drenges testudstyr skal jo også konnekteres.