Converter & Generator test equipment

  • Extensive expertise as test equipment supplier for design verification and volume-production
  • In-depth knowledge and understanding of the end-products allows for highly effective development of test-equipment
  • 24 hours engineer hotline and repair services are available to ensure minimum downtime in case of product or test equipment failure
  • PLC programming and user friendly HMI
  • Data collection and evaluation
  • The facilities at PowerCon support the build and run in of all kind of equipment due to large construction areas and high power capability in house for testing purpose
  • The fact that the entire system can be assembled and tested before shipment significantly reduces risk and installation time on site

 

Track record Production test systemsPowerCon Test Bench

  • Generator test equipment 6MW
  • 1MVA converter module production burn in end test
  • 5MVA complete converter production burn in end test

 

Track record of R&D verification test equipment and tools

  • Generator test equipment 6MW
  • Generator test equipment 8MW
  • 1MW converter module burn in test
  • 200kW Test bench for generator and converter
  • LVRT test equipment for 200kW turbine
  • Simulation tool for 20MW turbine test bench